UPDATE: The out-of-hours work has concluded for this intersection, however, the intersection will remain closed for day works until Wednesday 30 May.

 

Due to unforeseen circumstances, the proposed cable hauling works on Flemington Road and Nullarbor Avenue have had to be rescheduled.

 

Previously notified as starting on Sunday 17 April, the works will now begin Sunday 29 April, 2018.

 

Construction Works at Nullarbor Avenue and Flemington Road intersection:

Haulage of cables for traffic signals is required within the Light Rail median on:

Sunday 29 April 8:00pm until Friday 11 May 6:00am.

 

Traffic Management & Detours

Traffic travelling northbound and southbound on Flemington Road will be maintained.

The intersection will be closed to:

  • traffic turning right into Flemington Road from Nullarbor Avenue, and
  • all through traffic along Nullarbor Avenue.

Detours will be sign-posted, with traffic management in place and highly visible throughout the works.

 

Additional Information:

The equipment and plant to be used includes:

  • heavy vehicles;
  • jack hammer
  • lighting towers; and
  • hauling winch.

The construction team will limit these impacts wherever possible by reducing the number of machines operating at the same time and turning off equipment when not in use. Noise blankets will be installed where practical. Non-tonal reversing beepers will be used and workers will be instructed to keep noise to a minimum. Some of these works may be noisy. 