Out of Hours Notice, Stormwater Drainage Works 26 February - 5 March 2018

Stormwater drainage pits and lines in the median from Barry Drive/Cooyong Street down to Alinga Street along Northbourne Avenue need to be installed. This work is proposed to take place over a one-week period starting at 9:00pm on Monday 26 February to 6:00am Monday 5 March. There is no out-of-hours works scheduled on Friday and Saturday evenings, 2 and 3 March

Traffic changes:

  • Fast lane closures between Barry Drive/Cooyong Street and Alinga Street in southbound direction along Northbourne Avenue
  • Northbourne Avenue north and southbound traffic unaffected
  • No detours required, traffic management in place and highly visible throughout the works.
  • Pedestrian management will be in place to ensure the safe crossing of Northbourne Avenue

Additional Information:
The equipment and plant to be used includes road saws and quick-cut saws, hydro-vac trucks, plate compactor, light vehicles, excavators, cranes and trucks. Due to the nature of the work, some of the activities will be noisy.

The construction team will limit these impacts wherever possible by reducing the number of machines operating at the same time and turning off equipment when not in use. Noise blankets will be installed where practical. Non-tonal reversing beepers will be used, and workers will be instructed to keep noise to a minimum. 

Thank you for your patience during these important works.