Out of Hours Notice - Mapleton Avenue and Flemington Road Intersection 17 January - 6 February 2018

Scope of Works:
Preparatory works ahead of laying of rail need to occur within and adjacent to Mapleton Avenue intersection on Flemington Road. This includes cutting of the existing road surface, removal of spoil, installation of new drainage and re-surfacing. Other works include installation of electrical conduits for traffic signals and traffic light footings and bases.

There will be road detours in place to divert vehicle traffic and buses at night. Traffic management will be in place and highly visible throughout the works, including signage and personnel.

Works Schedule:
All works will be carried out between 8pm to 6am on the following dates:

Wednesday 17 January to Tuesday 6 February 2018 – Continuous.
NOTE: There will be no night works during the Australia Day Public Holiday weekend evenings of 26, 27 and 28 January.

Additional Information:
The following equipment will be used during these works:

Road saws, excavators, vacuum excavator truck, water truck, asphalt paver, asphalt profiler and compaction equipment including roller and vibration plates.

There will be noise associated with this work however every effort will be made to minimise disruption to residents.

Thank you for your patience during these works.

Detour map for Mapleton Ave

Publish date:
12 January 2018